Sunday, April 12, 2009

Let the dunging begin!

I know it's been a long time coming , but there has been alot of work taking place the last month. So here we go! The Cookie Monster blue carpet was the first thing to go.
It was hard to yank out and after doing so I found that there was at one time a couple of benches and another table post hole where the current bench/bed is. ( bench not shown in this picture)

While waiting for the carpet layer to show up, I needed to replace the front engine compartment door with something a little more cool and weather proof.
Aluminum diamond plate! A friend at the local recycle yard hooked me up with a huge sheet of diamond plate for dirt cheep. Thanks Mike!

Carpet is in thanks to an old friend, John Sanchez. The carpet was another sweet deal. 20 bucks!

Emma in her Napoleon Dynamite boots loved grooving with Lindsay on the fresh carpet.

I had to finish a couple spots in the drivers area that needed carpet.

Well, with all the fresh carpet we just had to do some painting. Brad and Emma were a big help with the priming and painting.


Once again with the Napoleon Dynamite Boots. ???

Painting and carpet complete! Now the bench/bed is currently being recovered by Becky.

I know this is a little out of order but we had some water damage to attend to before we began painting.


We ripped the back wall off and kept Maisy near by just in case a mouse jumped out.

All dead wood cut out.

Fresh wood in place and waiting to be insulated and covered.

OH Yeah! Fresh wall, paint, carpet and to top it off Becky's sweet treatment on the cushions. Much nicer.
Becky is working on bar stool covers to match back seats and sofa at the moment. We just had the front windshields replaced and best of all it passed the safety inspection. Woo hoo! The curtains are being washed and will be back in soon. We are just about ready to camp. Stay tuned!

I dont know why this is in here. Hi Maisy

1 comment:

stacy said...

you guys are AWESOME! it looks so good shane! i am really impressed!